Weifang Power Plant(2×300MW+2×600MW) is awarded Luban Prize, National Best Design Golden Prize, National Best Welding Project Prize, State Power Corporation Best Quality Prize and National First Design “Optimize Model” Project. The whole Phase Ⅱ was put into operation in year 2007.
SEPCO Electric Power Construction Corp(SEPCO)
Copyright 2007. SEPCO Electric Power Construction Corp(SEPCO) All rights Reserved. 鲁ICP05002490号